E1.20 RDM (Remote Device Management) Protocol Forums  

Go Back   E1.20 RDM (Remote Device Management) Protocol Forums > RDM Developer Forums > RDM Timing Discussion

RDM Timing Discussion Discussion and questions relating to the timing requirements of RDM.

Reply
 
Thread Tools Search this Thread Display Modes
Old July 6th, 2009   #1
ericthegeek
Task Group Member
 
Join Date: Aug 2008
Posts: 390
Default

> I would interpret the above to mean that a responder
> must accept packets meeting the timing requirements
> of Table 3-3 line 1 even though the maximum time
> values are greater than the allowed Controller Packet
> maximums.

This is because an RDM responder also needs to work with DMX transmitters developed to the DMX512/1990 and E1.11/DMX512A standards that allow a 1 second break. Thus, when receiving data they must accept the long break.

A device built to the E1.20/RDM standard cannot generate a 1 second break.
ericthegeek is offline   Reply With Quote
Reply

Bookmarks

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Time between controller packets Dan Scheurell RDM Timing Discussion 1 April 1st, 2007 11:38 PM
Exceeding MAB time Dan Scheurell RDM Timing Discussion 2 March 30th, 2007 08:23 AM


All times are GMT -6. The time now is 03:22 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.